Complete PV module dismantling line
Four stations, one sequence, one set of output bays. A line is not simply machines placed in order — it is the transfer heights, the containment, the
There is a well-established alternative route in which modules go straight to size reduction and everything is separated afterwards from a mixed granulate. It is a legitimate engineering choice with a smaller footprint and fewer stations, and it is the right answer for some plants.
What it cannot do is give you clean aluminium and clean glass, because both are contaminated from the moment the frame goes through the mill alongside the laminate. If those two streams are where your revenue comes from, dismantling comes first and reduction comes after — on material that no longer contains a frame or a junction box.
Every separation stage on this site is judged by what it produces, and every one of them produces fines. Fines block transfer points, they escape to the floor if extraction is undersized, and they change the composition of whatever stream they settle into.
The practical requirements are unglamorous: extraction at each break and transfer point, sealed collection rather than open bins, transfer geometry without ledges where material accumulates, and maintenance access so that cleaning is a routine task. A separation stage that is difficult to clean will be cleaned less often than it needs to be, and that shows up as a falling output quality rather than as a machine fault.
Send us the output specification you have to meet — or the buyer's requirements if you have one. Separation configuration follows from that, not from a catalogue.
If your revenue depends on clean aluminium and clean glass, dismantle first. Frame and junction box removal keeps those streams separate, and there is no economic way to un-mix them after reduction. If your outlet is a mixed-fraction processor and footprint or capital is the binding constraint, a reduction-first route can be the right choice.
In broad terms a glass-rich fraction, a metal fraction, a polymer and encapsulant fraction, and a silicon-bearing fraction containing the cells. The exact split and the purity of each stream depend on the equipment configuration and on what the downstream buyer will accept.
By extraction at every point where material is broken or transferred, sealed collection instead of open bins, transfer geometry that does not trap material, and maintenance access that makes cleaning routine. It is designed in, not added afterwards.
It can, and some operators buy only this stage to process material that has already been dismantled elsewhere. In that case the incoming material specification matters more than anything else, because the separation settings depend on what is already in the feed.
Tell us what arrives at your gate and what has to leave. The engineering team replies with the station configuration, the scope boundary and the information still missing before drawings start.
Prefer to talk first? WhatsApp +86 182 0399 3035 or email [email protected].